Detached, attached or garage
ADU Construction in Bogart for Family or Rental Use
A small, complete home with its own kitchen, bath and entrance, built in your yard or garage, with the work kept away from the house you are living in.
Talk zoning and lot size with us at (000) 000-0000
A Second Home, Built Beside the First
Think of an ADU as a small house that shares your lot: its own front door, kitchen, bathroom and sleeping space. It can stand detached in the yard, attach to the house or take over a garage.
Zoning comes first. County and city rules set the size, the setbacks and whether the unit can be rented. Once those answers are clear, construction runs mostly outside your house, with trenching, deliveries and cleanup planned so the yard and driveway stay usable.
What Goes Into an ADU
-
Structure
A detached unit gets a new foundation and new framing; a converted garage is reinforced, insulated and divided into rooms.
-
Utility runs
Water, sewer and power carried from the main house or the street. The distance involved is one of the biggest cost drivers on any ADU.
-
A livable interior
Kitchen, bathroom and sleeping area, insulated and finished, with the plumbing and wiring that a self-contained home requires.
Before an ADU Gets Priced
-
What zoning allows
County or city rules settle three things first: if your lot qualifies, the largest unit allowed, and whether renting it out is an option.
-
Garage or new build
A garage conversion reuses the slab and walls and usually costs less. A detached unit gives more privacy but is built from the ground up.
-
Disruption to the yard
Utility trenching and deliveries cross the yard. We plan routes and staging so the driveway and the main house stay usable throughout.
ADU Questions
Is renting the unit an option?
It depends on local zoning. Some jurisdictions allow rentals freely, some add conditions and some restrict them. Confirm your lot's rules before counting on rental income.
What is the usual build time for an ADU?
A garage conversion can take a few months. A detached unit usually takes longer once plans are approved, since it starts at the foundation. Utility distance and finish level also play a part.
Room on the Lot for an ADU?
Tell us about the yard or garage, who the unit is for, and whether you hope to rent it.
(000) 000-0000 — start with who the ADU is for